Preparation of Preliminary Design and Bidding Documents for Reconstruction of Boiler Houses and Central Heat Substations in the City of Mykolaiv

Ukraine District Heating Energy Efficiency Project

     Ukraine has received financing from the International Bank for Reconstruction and Development (IBRD) in the amount USD 382 million for Ukraine District Heating Energy Efficiency Project.

     The Oblasne Public Utility “Mykolaivoblteploenerho” received a portion of the financing in the amount of US$21,77 million.

Ukraine
Mykolaiv
Date: December 2016 - December 2018
Duration: 24 months
Client: The Oblasne Public Utility “Mykolaivoblteploenerho”
Funding: International Bank for Reconstruction and Development (IBRD) - USD 21,77 million

Project overview

     The Oblasne Public Utility “Mykolaivoblteploenerho” intends to apply part of the proceeds for the following consulting services: preparation of design and bidding documents for reconstruction of 32 boiler houses and 4 Central heat substations in the city of Mykolaiv.

     Currently, the primary and ancillary equipment and boiler house premises are characterized as physically obsolete and outmoded, thus, effecting both: reliability of boiler house overall performance and compliance with environmental norms on emission of pollutants to the environment. Energy consumption indicators exceed current regulatory norms.

Our missions

   Within this project, the Egis team will responsible for:

  • Preparation of design documents for the corresponding preliminary design stage for reconstruction of 32 boiler houses in compliance with the calculated complexity degree of each object;
  • Preparation of design documents (“Technical-economic calculation” stage) for reconstruction of 4 Central Heat Substations;
  • Preparation of bidding documents for further selection of the Contractor for the reconstruction of 32 boiler houses and 4 Central Heat Substations.